Arbuckle Costic Architects - K-12 School Projects

Arbuckle Costic Architects

Renderings by Arbuckle Costic

Yamhill-Carlton School District

We assisted the Yamhill-Carlton School District with their bond improvement projects. Work included mechanical, electrical, and seismic upgrades on all existing facilities. A new cafeteria/multi-purpose facility was designed and constructed on the shared campus between Yamhill-Carlton High School and Yamhill Grade School. Six new classrooms were added to the high school utilizing volume within their existing building for a second floor. A three classroom addition at Carlton Grade School along with improvements to the gymnasium were also part of the bond measure. The work was done in three bid packages with the majority of the renovation work being undertaken prior to the start of the 2002 - 2003 school year with the balance of work being completed prior to Winter Term 2003.

Back to Top